Goma Int'l Airport

Goma Int'l Airport

[ICAO – FZNA, IATA – GOM]

CountryDr Congo
EmployerWorld Bank
Contract date2016 – 2018
BeneficiaryMinistry of Transportation of the Democratic Republic of the Congo
DisciplinesCivil designPavement structure designStormwater drainage designStormwater analysisSynthesis plan of installationsVertical signalization designHorizontal marking design
About Project

Rehabilitation and Expansion of the Main Apron: The project involves the detailed design for the rehabilitation of the existing main apron, covering an area of approximately 16,000 m², as well as its expansion northward by an additional 8,000 m². The scope includes reconstruction of pavement surfaces and the design of a complete drainage system, ensuring full integration with the existing stormwater network.

Design of the New Air Traffic Control Tower Complex with Technical Block: The scope includes the development of a comprehensive design for the new control tower complex, beginning with a site selection study, orientation analysis, and determination of the optimal tower height.

Architectural and structural design concepts are explored through multiple variants, followed by a preliminary design phase. The final design includes a 26-meter-high air traffic control tower and an integrated technical block of 900 m², with a functional capacity for up to 50 personnel.